We have recently installed a 15KVA Riello Sentryum UPS unit (with unity power factor and 96.5% efficiency) in the newly created radiology department (mammography). In addition, we also installed a surgeons control panel and IPS system in the recently renovated operating theatres.
Day: March 16, 2020
LARNACA GENERAL HOSPITAL 100 KVA UPS INSTALLATION
Databus Ltd has recently installed a Riello Multisentry 100KVA UPS System in the Hospital’s new wing. The system supports medical equipment which requires continuous power when used in the treatment of patients.